The Hydro and Wind Company Securing a clean energy future, profitably

Norvento nED 100 Wind Turbine

The Norvento nED100 Wind Turbine

The Norvento nED100 100 kW Wind Turbine

What is the Norvento nED 100 most suitable for?

The Norvento nED-100 100kW Wind Turbine is available in two rotor sizes, 22m and 24m diameter and is suitable for :

  • Modestly windy sites
  • Limited grid capacity sites or high grid costs
  • Sites where noise is an issue
  • Small / Medium sites
  • On-site generation
  • Factories
  • Seaports
  • Shopping Centres
  • Leisure Centres
  • Farms
  • Schools
  • Hospitals
  • Government and Institutional Buildings
  • Community
  • Commercial and industrial sites

nED-100 100 kW Specification

Turbine
Configuration Three blade, horizontal axis, upwind
Rated Power 100kW at 10m/s
Rotor Speed 33 to 67 rpm
IEC 61400-1 Turbine Class IIIA
Site Average Wind Speed 7.5 m/s
Survival Wind Speed 52.5 m/s or 117 mph
Rotor
Rotor Diameter 22 m / 24 m
Swept Area 380 m² / 452 m²
Blade Material Fibreglass and epoxy resin
Power regulation Full blade variable pitch
Generator
Generator Type Permanent Magnet Synchronous Generator (Direct Drive)
Configuration 3-Phase, 400 VAC, 50 Hz
Brake & Safety System
Main Brake System Two electromechanical brakes operating in parallel
Automatic Shutdown triggered by High wind speed, grid failure, over-speed, all other fault conditions
Controls
Control Systems User Interface Programmable Logic Controller (PLC)
nED Scada Control Centre
Towers
Available Hub Heights 24.5 m, 29.5 m, 26.0 m
Tower Type Multi-sections tubular steel tower
Warranty
Period and type Standard – 5 year parts and labour optional:
Download Data Sheet Here

Want to install a wind turbine?

If you are in the UK then take our Wind Site Self-Assessment - Step 1 of our modular Windpower Feasibility Study. It takes about 20 minutes to work through the basic checks to see if your site might be suitable, including:

  • Estimating wind speed
  • Checking proximity of nearby properties
  • Checking site access and approach roads
  • Investigating connection with the grid

If you are in the Republic of Ireland, or overseas, the first step is to consider our modular Windpower Feasibility Study, so please Contact us to discuss your site further.

Start the process here: Take the Wind Site Self-Assessment