With the turbine foundations and all electrical components in place, the Hibaldstow wind turbine was ready for installation – despite the lousy weather!
Hibaldstow Farm – 500 kW EWT Wind Turbine
EWT DW54 500 kW turbine for Hibaldstow Farm
Given their experience and technical expertise, Renewables First were hired to specify and design the scheme, as well as project manage the civil, mechanical and electrical components of the project. The sequence of pictures below illustrate some of the key activities in the run up to installing the EWT 500 kW turbine.
Older Project Posts -
Hibaldstow Farm – 500 kW EWT Wind Turbine
Oops!
Either the link you followed or results for the search you performed can't be found.
Try a different search, or use the navigation above:
Are you considering a low carbon renewable energy project?
Renewables First have considerable experience and full project capability, from initial feasibility studies through to system design and installation for Hydro, Wind, PV, Energy Storage Systems, Water and Ground Source Heat Pump Systems.
We also specialise in consultancy for Energy independence / Back-up electricity systems, Net zero energy production, Off-grid / Standalone and Remote power systems
Please contact us about your low carbon energy project today.