Wind Planning & Grid Connection Services

Securing wind turbine planning consent in the UK can be one of the biggest hurdles in developing a successful renewable energy project. While government policy is now far more supportive of onshore wind projects – with targets to double capacity to 30 GW by 2030 – the process remains complex. Success requires detailed technical studies, robust planning documentation, and skilled management of the application.

At Renewables First, we are specialist wind energy planning consultants. We provide expertise, efficiency and a pragmatic approach at every stage, helping you de-risk your project and achieve a positive planning outcome. If you are planning a wind turbine or wind farm, we can help you navigate the planning system with confidence. Contact Renewables First today to discuss your site and how we can support your wind planning application

Ready to start your onshore wind installation project? Contact us today.

Home » Services » Windpower » Wind Turbine Planning Consent UK

Our wind planning process

We break down the onshore wind planning application process into five clear phases:
 

  1. Identifying and reducing high-risk issues (pre-planning works)
  2. Preparing and submitting the planning application
  3. Managing the application through to decision
  4. Discharging planning conditions
  5. Managing appeals if required
Step 1: Pre-Planning Works – Mitigating High-Risk Issues

After wind feasibility study, we identify any high-risk issues that could be problematic during the planning process. Tackling these early avoids wasted time and cost.

Typical high-risk items for wind turbine sites include:

– MOD and civilian aviation or radar conflicts
– Civilian airspace safeguarding concerns
– Grid connection availability
– Communication and microwave link interference
– Noise impacts on nearby dwellings
– Shadow flicker assessment
– Heritage and cultural landscape sensitivities
– Access and transport feasibility

We also handle early consultations, including:

– Local Authority pre-application discussions
– Local Authority Environmental Impact Assessment (EIA) screening and scoping

Step 2: Preparing and Submitting the Planning Application

Once pre-planning works are complete, we prepare a comprehensive wind turbine planning application for submission to the Local Planning Authority (LPA). This ensures your project is presented credibly and professionally.

Typical application documents include:

– Preliminary Ecological Appraisal (PEA)
– Specialist ecological surveys (birds, bats, etc.)
– Environmental Statement (or Environmental Impact Assessment for EIA sites)
– Landscape & Visual Impact Assessment (LVIA)
– Cultural heritage and archaeological assessments
– Noise surveys and impact assessment
– Aviation & radar impact reports (MOD, NATS, airports)
– Communications link consultations
– Shadow Flicker Assessment
– Hydrology, flood risk & drainage assessment
– Transport and access studies
– Site plans and maps
– Biodiversity plan (Biodiversity Net Gain in England; Net Benefit for Biodiversity in Wales; Positive Effects for Biodiversity in Scotland)
– Planning Statement
– Design & Access Statement
– Application forms and fee calculations

At Renewables First, many technical assessments are completed in-house, ensuring consistency, cost efficiency, and accuracy. For external studies, we coordinate with specialists and agree scope with the LPA upfront.

Step 3: Managing the Application

We proactively manage your onshore wind planning application through to decision. This includes:

– Validating and securing acceptance of the application
– Responding quickly to consultation responses and queries
– Negotiating additional information requests pragmatically
– Maintaining application momentum to avoid delays

Our team builds constructive relationships with Planning Officers, consultees, and stakeholders — a critical factor in achieving consent.

Step 4: Discharging Planning Conditions

Every approved application comes with planning conditions. These may include simple confirmations or more complex requirements, such as additional surveys.

We review all conditions as soon as consent is granted and produce a planning condition discharge plan. This gives you a clear view of costs and timescales, helping you integrate the process into your construction programme.

Step 5: Appeals and Challenges

If consent is refused, an appeal may be necessary. As experienced wind planning consultants, we prepare and manage appeals to ensure your project receives a fair hearing, supported by strong technical and planning arguments.

Grid Connection Permission

Alongside planning, every wind turbine project must secure grid connection approval. While technically straightforward, the UK distribution network is often constrained, and not every site has available capacity.

We help identify solutions, such as:

  • Maximising on-site energy consumption
  • Private-wire supply to nearby large electricity users
  • Energy storage systems to smooth and optimise output

Early grid strategy is essential for project viability and bankability.

Why Choose Renewables First?

  • Proven track record in securing consent for wind turbine and wind farm planning applications
  • In-house technical expertise across multiple assessment areas
  • Established relationships with LPAs and statutory consultees
  • A pragmatic, solutions-focused approach that reduces risk
  • Can also do the wind feasibility and provide wind installation services

If you are planning a wind turbine or wind farm, we can help you navigate the planning system with confidence. Contact Renewables First today to discuss your site and how we can support your wind planning application.

Our Clients

Renewables First works with commercial businesses, farms, industrial operators and landowners across the UK to deliver high-performing renewable energy projects.

We do not just produce reports. We design, build and operate renewable energy systems that generate measurable results.

Landowners, Farmers and Estates

Commercial Clients

Utility Companies

Community Groups

Local Authorities

Investors

Private Residences

Educational Institutions

Conservation Groups

Landowners, Farmers and Estates

Commercial Clients

Utility Companies

Community Groups

Local Authorities

Investors

Private Residences

Educational Institutions

Conservation Groups

We don’t just talk and write reports – we actually build stuff!

Our Windpower Projects

Here are some examples of past Windpower projects.
wind turbine case study

Blacktoft Nursery, 500 kW EWT DW54 Wind Turbine

Feasibility, design, consenting and construction. Directly supplying an enormous commercial greenhouse.

Hibaldstow Farm 500kw EWT wind turbine project

Hibaldstow Farm, 500 kW EWT DW54 Wind Turbine

Design, project management and delivery. Supplying the chicken farm with electricity and surplus exported to the grid.

Baulker farm 500kw wind turbine on chicken farm

Baulker Farm, 500 kW EWT DW54 Wind Turbine

Complex integration of a large wind turbine into a constrained site with power used to supply the chicken farm.

Want to Learn More?

We often hear the same key questions from clients — here are some of the most important ones, with links to in-depth answers in our Learning Centre.

Other Renewable Services we offer

Energy Storage Systems

For better alignment of your generation and demand profiles, and making best use of Time-of-Day electricity pricing

Heat Pumps

Specialists in water-source heat pumps and heat extraction from water courses, particularly rivers

Consultancy

Decades of experience of complex analysis, design, consenting and construction. We know how to solve problems, or avoid them completely

Solar PV

Large roof-top, ground-mounted, solar carports and floating solar, 50 kW to 5 MW+

Hydropower

Low, medium and high-head schemes and all turbine types, 25 kW to 2 MW+