Case study of Crossflow turbine upgrade – This hydro project involved creating a new split-phase grid connection, the removal of an old Gilkes turbine, refurbishing the turbine house with a lowered concrete floor and installation of a new Crossflow turbine.
Kenningstock Mill Hydro
Case Study: Kenningstock Hydropower System with GoFlo Travelling Screen
Kenningstock Mill scheme is located at Camelford in Cornwall. The hydropower component comprises a 25 kW Crossflow turbine, with a calculated annual generation of 107,454 kWh per year, enough to power the equivalent of 25 UK homes and displacing 53,727 Kg/CO2 per year
Older Project Posts -
Kenningstock Mill Hydro
Oops!
Either the link you followed or results for the search you performed can't be found.
Try a different search, or use the navigation above:
Are you considering a low carbon renewable energy project?
Renewables First have considerable experience and full project capability, from initial feasibility studies through to system design and installation for Hydro, Wind, PV, Energy Storage Systems, Water and Ground Source Heat Pump Systems.
We also specialise in consultancy for Energy independence / Back-up electricity systems, Net zero energy production, Off-grid / Standalone and Remote power systems
Please contact us about your low carbon energy project today.