Mar 30, 2012
When assembling the hub and wind turbine blades, the challenge at Baulker Farm was one of space limitations due to the proximity of farm buildings and the large chicken sheds. With the rotor blade diameter of the EWT 500 kW turbine being 54 metres, a large surface area was required.
Read more...
Mar 30, 2012
The turbine generator is first lifted from its horizontal position on the delivery vehicle into a vertical position, ready for it to be fixed to the nacelle at the top of the turbine tower.
Read more...
Mar 29, 2012
With the lower tower section in place, the next phase of the wind turbine installation involves the upper tower section being installed. As with the lower section, both the main and tail cranes were used for the initial lifting until the section was vertical, at which point the main crane took over.
Read more...
Mar 28, 2012
With the turbine foundations completed, the site was ready for the DW54 EWT 500 kW turbine to be installed. The first to arrive was the lifting crane. This was a 1000 tonne mobile crane, required to lift the huge 30 tonne tower sections and generator up and over the chicken shed!
Read more...
Mar 23, 2012
The Cotehele hydro scheme uses a 7 kW Crossflow turbine and is installed on a National Trust owned working flour mill. The scheme is designed to work alongside an existing waterwheel.
Read more...
Mar 18, 2012
The site at baulker farm is also interesting in that there were challenges with the wind turbine earthing. This is because the ground is comprised mostly of sand which has a very low conductivity.
Read more...
Mar 15, 2012
Having completed the initial foundations for the Powerwind turbine, Powerwind then ceased trading. This meant that the completed Powerwind foundation then had to be adapted to accommodate a different turbine – in this instance, Renewables First specified a DW54 EWT 500 kW turbine.
Read more...
Feb 15, 2012
Having already obtained planning permission to install a 500 kW wind turbine, Baulker Farm approached Renewables First having becoming aware of their expertise and experience with project managing wind and hydro systems.
Read more...
Jan 15, 2012
This high head hydropower scheme uses a 27 kW Pelton turbine to generate power using water from a small tributary of the River Exe, near Miltons, Dulverton, Somerset.
Read more...
Oct 21, 2011
This high head 15 kW micro hydro scheme is located on farmland in the Peak District National Park, and incorporates a Coanda screen and a Crossflow turbine.
Read more...
Jun 20, 2011
The Rochdale hydro scheme helps to power Rochdale’s £11.5 million Transport Interchange, linking bus and rail services for Rochdale and the surrounding area. It is reputed to the first Interchange in Europe to run partly on hydro-electric power, thanks to the 21 kW Archimedes screw turbine harnessing power from the River Roch.
Read more...
Aug 24, 2010
The Tipton Roller Mill hydro scheme comprises a 28 kW grid connected Archimedes screw turbine. The scheme is located between Tipton Weir and the Roller Mill. The turbine is housed in a newly constructed channel between the existing leat and the River Otter. The turbine will churn up to 1500 litres water per second over a 2.6m head.