Case study: New Mills Archimedes Screw

Case study: New Mills Archimedes Screw

Project managed by Western Renewable Energy (a subsidiary of Renewables First), this hydropower scheme involved crane lifting the 63 kW Archimedes screw turbine from a high road bridge into the river gorge.

Read more...

Case study – River Dart Country Park hydro

Case study – River Dart Country Park hydro

This hydropower scheme comprises a 50 kW Archimedes screw turbine on the River Dart within the Dartmoor National Park, The screw was the first large grid connected hydropower turbine in the UK, setting precedents for both the engineer-installers and the Environment Agency.

Read more...