Case Study: Hydropower refurbishment at Pale Hall, Wales
100 KW Hydropower scheme at Scottish Forestry Commission site
Case Study – Kenningstock Mill Crossflow Turbine on the River Camel, Cornwall
Case study of Crossflow turbine upgrade – This hydro project involved creating a new split-phase grid connection, the removal of an old Gilkes turbine, refurbishing the turbine house with a lowered concrete floor and installation of a new Crossflow turbine.
Read more...Renewables First celebrates a year of achievements in 2017
Case Study: Kenningstock Hydropower System with GoFlo Travelling Screen
Kenningstock Mill scheme is located at Camelford in Cornwall. The hydropower component comprises a 25 kW Crossflow turbine, with a calculated annual generation of 107,454 kWh per year, enough to power the equivalent of 25 UK homes and displacing 53,727 Kg/CO2 per year
Read more...Lady’s Dingle: 45 kW Turgo turbine for Snowdonia site
Renewables First was recently hired to produce detailed designs for a hydropower scheme in the Snowdonia National Park, and project manage the installation through to commissioning. Lady’s Dingle is located near Betws-y-Coed, Gwynedd.
Read more...Civil engineering works proceed at Allt na Fearna hydro scheme, Scotland
Civil engineering works, including penstock burial, intake screen and hydro turbine house construction for the Allt na Fearna hydropower scheme are well under way.
Read more...Afon Maesgwm hydropower scheme on the Brodanw Estate completed
Renewables First played a key role in the construction of the Brondanw Estate hydro scheme from its conception through to current installation. Construction works on the Afon Maesgwm hydropower scheme are now fully completed.
Read more...Case Study: West Harris Trust 100 kW hydropower scheme completed
Renewables first was hired to review an existing feasibility assessment and preliminary construction designs for a hydropower scheme on Harris, in the Outer Hebrides, Scotland. Subsequenclty we were hired to complete the design, and to project manage construction installation and commissioning.
Read more...Maximising the benefits of hydropower technology using innovative GoFlo travelling screen technology
The Cochwillan hydropower scheme is an exemplar project demonstrating the benefits of combining hydropower with innovative water screening technology.
Read more...Suzanna Williamson – Carter Jonas – Cochwillan hydro scheme
The team at Renewables First provided us initially with clear and concise review of a partially planned project providing an alternative design. We found Renewables First to be very reliable and all members of the team very helpful throughout the project.
Read more...