Project Blog

Home » Project Blog » Page 2
Case Study: West Harris Trust 100 kW hydropower scheme completed

Case Study: West Harris Trust 100 kW hydropower scheme completed

Renewables first was hired to review an existing feasibility assessment and preliminary construction designs for a hydropower scheme on Harris, in the Outer Hebrides, Scotland. Subsequenclty we were hired to complete the design, and to project manage construction installation and commissioning.

read more
David & Caroline Legge – Curlew Hydro Scheme

David & Caroline Legge – Curlew Hydro Scheme

Having long dreamed of a hydro installation on our private burn, we sought high and low for a company who were willing to take on a smaller scale scheme which remained viable. Renewables First happily stepped in to accommodate us, providing a positive feasibility study and secondly going on to carry out and manage all aspects of the scheme.

read more

Older Project Posts -
Project Blog

Adam De Benedictis – City of Cardiff Council (Radyr Weir hydro)

"At Radyr Weir, we had a very short timescale to design and install the hydro scheme. Renewables First were fantastic throughout in ensuring that the deadlines were met. They very quickly produced detailed design drawings for the fish and eel passes, powerhouse and...

Renewables First Principal Contractor for Errwood Hydropower Scheme

Owned by United Utilities, the Errwood hydropower scheme is a Replacement Project in which an old and inefficient 150 kW turbine (actually a pump working in reverse to generate electricity) installed back in the 1980’s, was replaced with a much more efficient purpose-built 100 kW Francis turbine.

Renewables First Celebrates a Year of Achievements in 2016

2016 was a very productive year for Renewables First, as it played a key role in a number high-profile hydropower and windpower schemes throughout the UK. The year also saw the installation of two GoFlo self-cleaning screens on hydropower sites, by our sister company, GoFlo Screens Ltd.

Cochwillan hydro power scheme installed by Renewables First

The Cochwillan hydro scheme utilises a large GoFlo self-cleaning screen located on the water intake. GoFlo screens are fully automated and self-cleaning screens, with a rotating mesh that scoops debris out of the water and deposits it in a trough to be flushed downstream of the turbine.

Shenfield hydro scheme commissioned

The Shenfield hydro scheme, as well as being economically viable, also improves the connectivity of the river, reduces flood risk and generates low-carbon electricity.

Case study: Freemans Reach Hydro Scheme

Renewables First was hired to undertake a full hydro feasibility study for the Freemans Reach hydro scheme, as well as the detailed design of the hydro scheme and fish passes. Renewables First also provided hydro engineering support during construction, as well as commissioning the scheme.

Case Study: Buckfast waterwheel hydroelectric scheme

Our work on the Buckfast waterwheel underlines our capability to provide intelligent refurbishment of sites, assessing existing equipment, and where possible retaining sound infrastructure and integrating new technology to achieve either energy capture improvements, reduction in manual intervention, or compliance with new environmental best practice.

Are you considering a low carbon renewable energy project?

Renewables First have considerable experience and full project capability, from initial feasibility studies through to system design and installation for Hydro, Wind, PV, Energy Storage Systems, Water and Ground Source Heat Pump Systems.

We also specialise in consultancy for Energy independence / Back-up electricity systems, Net zero energy production, Off-grid / Standalone and Remote power systems

Please contact us about your low carbon energy project today.