The Shenfield Mill Archimedes screw turbine will have a maximum generating capacity of 60kW, which would be sufficient to meet the annual electricity needs of approximately 78 English homes. The scheme will also involve the construction of an intake, discharge and turbine channel adjacent to the Weir, construction of a generator building and reinstatement of landscape and a planting scheme.
Project Blog
100 kW Wind Turbine Project in Pembrokeshire
This single turbine wind power development in Pembrokeshire, utilises a Norvento nED 100 turbine. Renewables First were responsible for the pre-installation phases, including the all important site finding, detailed feasibility and planning applications.
Radyr Weir hydro scheme commissioned
The Radyr Weir hydro scheme located on the River Taff, South Wales, is now fully completed and operational. The 2 x 200 kW Archimedes screw turbines, with their combined capacity of 400 kW, were commissioned in December 2015.
Nant Peris hydro scheme completed
This 350 kW Pelton turbine on the Afon Gafr, Nant Peris, will generate around 1,100,000 kWh per year, equivalent to powering roughly 333 UK homes (based on a median UK consumption of 3300 kWh, EST 2012), as well as a carbon saving of around 473 tonnes per year.
Beasley Weir hydro, Dulverton, completed
The Beasley Weir hydro scheme is located on the River Barle, near Dulverton, is an exemplar of environmental sustainability and incorporates a 78 KW Archimedes screw and natural fish pass.
A drone’s eye view of Radyr Weir scheme
Construction work is forging ahead with installing the Radyr Weir Archimedes screws. Renewables First were hired by Dawnus to produce the detailed designs for the 400 kW Radyr Weir Archimedes screws, project managed and installed by Dawnus.
Case Study: Cross flow turbine installation in Scotland
Installed by Renewables First, this cross flow turbine installation is located at Curlew Cottage, Inchlaggan, adjacent to Loch Garry approximately 30km north of Fort William.
Nant Peris Hydro scheme nearing completion
Work is proceeding apace on the Afon Gafr hydro scheme at Nant Peris, Snowdonia. Throughout the last six weeks, Renewables First has project managed the civil, mechanical and electrical engineering elements of the hydro scheme. The 350 KW Pelton turbine is now installed inside the newly constructed turbine house.
Radyr Weir hydro 400 kW Archimedes screws
Renewables First was commissioned by Dawnus Construction to undertake the detailed hydro design for the 400 kW Radyr Weir hydro scheme for Cardiff City Council.
Dulverton hydro – 78 kW Archimedes screw
This 80 KW hydro scheme on the River Barle, a large tributary to the Exe near Dulverton, was granted planning permission earlier this year.
Older Project Posts -
Project Blog
Guy Calder – Quarsol Ltd
"I’ve been working with Renewables First for over a year to get a 500 kW wind turbine installed on my farm. I’ve found them to be professional and knowledgeable on all aspects of wind development, and their engineers are a pleasure to deal with. I chose them...
Roderick Ellison – Ecosulis Ltd
"Having both worked for Renewables First (as a sub-consultant) and having drawn on their technical expertise as part of a multidisciplinary team I can highly recommend the company. I have found their work to be of the highest technical standard, and their staff to be...
Stuart Hodgkiss – Devon Wildlife Trust
"When Devon Wildlife Trust decided to restore Cricklepit Mill and make this the trust’s headquarters we wanted to demonstrate renewable energy being generated in harmony with the environment. Being a watermill, a small-scale hydropower system was the obvious choice so...
K. Fletcher – Private investor
"I have worked recently with Renewables First to find suitable sites for wind turbine development and have been extremely pleased with their services in every way. In particular I like their flexible and informative approach and their speed of response both of which...
Roger Yorke – Investor
"I’m in the process of getting permission to install two 800 kW Enercon wind turbines on the family farm in West Wales, and off the back of that am investing in other wind opportunities. In the early stages of the project I talked to lots of wind consultancies, but...
Ben Hooker – Water to Wire Ltd
"Over the last 18 months I have worked closely with Renewables First identifying opportunities in the UK renewables energy sector. They have consistently performed work of the highest standard, on time and on budget! They are a credit to themselves, their profession...
Kenn and Jackie Lloyd – Mill Owners
"We have been pleased to use the services of Renewables First to assist us in designing, building and installing a Hydro Generation plant on the River Yeo in North Somerset. Our property included the remains of an old Corn Mill, which was burned down in a fire in...
Charles Hudson – Farmer and Land owner
"My experience of working with Renewables First over the past three years has been one of politeness, competence and enthusiasm. These qualities have engendered confidence in their integrity and have been critical in the successful negotiations we have had with all...
350 KW Pelton turbine on Afon Gafr, Nant Peris
Renewables First design, speciify and install a high head 350 KW Pelton turbine on the Afon Gafr, Nant Peris, in Snowdonia National Park for Peris hydro Ltd.
Community Energy England Award for Saddleworth Hydro
Saddleworth Community Hydro wins the Community Energy Collaboration Award, recognising the ground-breaking association between a community group and United Utilities.
Are you considering a low carbon renewable energy project?
Renewables First have considerable experience and full project capability, from initial feasibility studies through to system design and installation for Hydro, Wind, PV, Energy Storage Systems, Water and Ground Source Heat Pump Systems.
We also specialise in consultancy for Energy independence / Back-up electricity systems, Net zero energy production, Off-grid / Standalone and Remote power systems
Please contact us about your low carbon energy project today.