Wind Turbine Installation

Wind Installation

Wind Installation

Taking a wind project from fully consented to fully installed requires multi-discipline engineering expertise, along with a working knowledge of heavy cranes and wind turbine installation logistics. Add project management capability and you have a Renewables First Wind Installation Engineer!

The wind installation phase starts with the design work to produce the wind site layout. This requires a topographical survey to determine ground features and levels affecting construction, a geotechnical survey to determine the ground conditions and design requirements for the foundation at the turbine location and an earthing survey to check the ground resistivity (required to design the electrical earth system). This information is then used to determine the location of the main items, such as the turbine centre, the wind turbine transformer and the high-voltage sub-station (if required). Once the locations of the main items are fixed the on-site electrical distribution can be designed and the cable trenches and routes specified.

We work with specialist structural engineers to get the groundworks designed and specified, and then manage a tender process for the works with several civil engineering contractors to ensure best value. Similarly we specify the high and low-voltage works required and put the works out to tender with specialist subcontractors.

Once the contractors are selected we project manage the process to ensure everything runs smoothly. In parallel we take care of the liaison between the client and the wind turbine supplier and heavy lifting contractor to ensure all of the access upgrades and crane pads are delivered on time and to the correct specification.

Once installed we will arrange and oversee the testing and turbine commissioning until the Final Acceptance Certificate is issued. Throughout the installation process the Renewables First Project Manager is the first point of contact for the client and will keep them up to date on progress.

Want to install a wind turbine?

If you are in the UK then take our Free Wind Site Self-Assessment - Step 1 of our modular Windpower Feasibility Study. It takes about 20 minutes to work through the basic checks to see if your site might be suitable, including:

  • Estimating wind speed
  • Checking proximity of nearby properties
  • Checking site access and approach roads
  • Investigating connection with the grid

If you are in the Republic of Ireland, or overseas, the first step is to consider our modular Windpower Feasibility Study, so please contact us to discuss your site further.

Start the process here: Take the Wind Site Self-Assessment

Already completed the Wind Site Self-Assessment?

Enter your access code here to see the next available module(s):

Alternatively, contact us to talk about a windpower project.