The Hydro and Wind Company Securing a clean energy future, profitably

Wind Turbine Consenting

All wind turbine projects require planning permission from the local authority and grid connection permission from the distribution network operator in order to be built and to operate. Timing, accurate information, expert project assessment and good communication are crucial to the success of a planning application and to maximising revenue for your wind turbine project. Obtaining wind turbine planning permission is the most critical aspect of your project

  • Wind turbine planning permission is difficult. We provide all of the services required to give your wind turbine planning application the best chance of success.

  • The Feed-in-Tariff scheme pays the wind turbine owner a fee for generating and exporting energy. Careful planning is required to maximise revenue.

Want to install a wind turbine?

If you are in the UK then take our Free Wind Site Self-Assessment - Step 1 of our modular Windpower Feasibility Study. It takes about 20 minutes to work through the basic checks to see if your site might be suitable, including:

  • Estimating wind speed
  • Checking proximity of nearby properties
  • Checking site access and approach roads
  • Investigating connection with the grid

If you are in the Republic of Ireland, or overseas, the first step is to consider our modular Windpower Feasibility Study, so please contact us to discuss your site further.

Start the process here: Take the Wind Site Self-Assessment

Already completed the Wind Site Self-Assessment?

Enter your access code here to see the next available module(s):

Alternatively, contact us to talk about a windpower project.